Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5401705 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Corrigendum : Supply Of Under Frame Complete For Power Car-lhb Eog Coaches To Drg. No. Lp11103, Alt "d", Anx-9 (without Item 30 To Drg. No.1.11012.0.03.095.001) For Painting Drg No (538) Lwlrrm-1-1-116, Alt "e" To Be Followed The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01,rev.02 With Amendment No.02. Special Condition : -the Under Frame Should Be Supplied As Normal Side Up And Side Bearer Side Down. Packing Condition As Per Drg No. Icf/j&t/misc-2487, Alt 'b'. Stage Inspection Detail. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensuredbefore Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [ Warranty Period: 30 Months After The Date Of Delivery ] |
| Last Date For Submission | 5th Oct, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
8 Days Left