Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Integral Coach Factory
Tender ID3983477
Organisation NameIntegral Coach Factory
Tender BriefShell Kit For Memu Dmc2 Jk 946 A. Roof Assembly 94416001 000 01, Alt 'nil' - 1 No. Location Of Sidewall 94414001 000 01, Alt 'nil' - 1 No. End Construction Pail End 94615001 000 01, Alt 'nil' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-200, Issue Status 01, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-315, Issue Status 01, Rev.0 0with Amendment No 01. B.supply Of One Coach Set Of Body Shell Items And Partition Frames For Memu Dmc2 Jk 946 To Drawing Nos: 1. 94410003 000 01, Alt 'a' - 1 No 2. 74510257 000 01, Alt 'nil' - 1 No 3. 94410004 000 01, Alt 'nil' - 1 No 4. 74510045 000 01, Alt 'nil' - 1 No 5. 94410005 000 01, Alt 'nil' - 1 No 6. 94410002 000 01, Alt 'b' - 1 No. 7. 94410076 000 01, Alt 'nil' - 1 No 8. 94410072 000 01, Alt 'nil' - 1 No 9. 94410054 000 01, Alt 'nil' - 2 Nos. C. Under Frame Arrangement 94411001 000 01, Alt 'a' - 1no. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-147, Issue Status 01 Rev.02 With Amendment No.02. Special Condition : Packing As Per Icf/j&t/misc-2201, Alt 'e'. Packing As Per Icf/j&t/sk-1809, Alt 'a'. Packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt 'b' The Underframe Should Be Supplied As Normal Side Up & Side Bearer Side Down. Packing Conditionas Per Icf/j&t/sk-1865, Alt 'a'. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item ]
Last Date For Submission7th May, 2026
Opening DateRefer to Documents
Cost
Document Cost0.00
EMD0.00
Estimated Cost0.00
Location
CityChennai
StateTamil Nadu

Register to see full details

7th May, 2026

26 Days Left

WhatsApp