| Tender Brief | Shell Kit For Memu Ndmc Jk 962 A. Roof Assembly 96216001, Col-1, Alt "a" - 1 No.location Of Sidewall 96214001, Col-1, Alt "nil" - 1 No. End Construction Pail End 94515001, Col-1, Alt "a" - 1 No. End Construction Shunting Desk Side 96215001, Col-1, Alt "nil" - 1 No Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-200, Issue Status 01, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-315, Issue Status 01, Rev.00 With Amendment No 01. B.supply Of One Coach Set Of Bodyshell Items And Partition Frames For Memu Ndmc Jk 962 To Drawing Nos 1. 96210002, Col-1, Alt "b" - 1 No. 2. 96210007, Col-1, Alt "b"' - 1 No 3. 96210026, Col-1, Alt "nil"- 1 No 4. 96210046, Col-1, Alt "nil"- 1 No 5. 96210064, Col-1, Alt "nil"- 1 No 6. 94410054, Col-1, Alt "nil"- 2 Nos 7. 94410076, Col-1, Alt "nil"- 1no 8. 94410072, Col-1, Alt "nil"- 1 No C. Under Frame Arrangement 96211001, Col-1, Alt 'd' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-147, Issue Status 01 Rev.03.special Condition : Packing As Per Icf/j&t/misc-2201, Alt 'f'. Packing As Per Icf/j&t/sk-1809, Alt'a'. Packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt 'b' The Underframe Should Be Supplied As Normal Side Up & Side Bearer Side Down. Packing Conditionas Per Icf/j&t/sk-1865, Alt 'b'. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Topsurface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item ] |