Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Integral Coach Factory
Tender ID5687943
Organisation NameIntegral Coach Factory
Tender BriefShell Kit For Rapid Metro C Shell A) Sidewall Complete To Drg No (573)icf/mrvc/c/bt-1-4-001, Alt'f' - Col-i -1 No (573)icf/mrvc/c/bt-1-4-001, Alt'f' - Col-ii 1 No Roof Assembly To Drg No 77216001, Alt 'nil' - Col-i 1 No. The Firm Shall Fulfil The Requirement As Per Icf/md/specn. 200, Issue Status 01, Rev 04 With Amendment No 01. B) End Wall To Drg No (616) Emu/c/3ph-1-5-001-alt 'f'-col-i -1no (616) Emu/c/3ph-1-5-002-alt 'd'-col-i -1no The Firm Shall Fulfil The Requirement As Per Icf/md/spec-315,issue Status-01, Rev.00, Amendment No 01. C) Under Frame To Drg No (573)icf/mrvc/c/bt-1-1-001, Alt'k' Col-i- 1 No The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01 Rev.02 With Amendment No.02. D) Body Shell Items To Drg No (717)emu/c/mmts-1-0-002, Alt 'a' Col-i-1 No Supply Condition: Back Pieces For Seats, Partition Frame & Grab Pole To Drg No (717)emu/c/mmts-1-0-002, Alt 'a' Col-i-1 No, To Be Welded On Under Frame And Supplied. Special Condition : A) Packing As Per Icf/j&t/misc-2201, Alt 'f', B) Packing As Per Icf/j&t/sk-1809, Alt 'a'. C) Packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt 'b' The Under Frame Should Be Supplied As Normal Side Up & Side Bearer Side Down D) Packing Condition As Per Icf/j&t/sk-1865, Alt "a". Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Crossmembers To Avoid Bi-metallic Corrossion. [safety Item ]
Last Date For Submission20th Oct, 2026
Opening DateRefer to Documents
Cost
Document Cost0.00
EMD0.00
Estimated Cost0.00
Location
CityChennai
StateTamil Nadu

Register to see full details

20th Oct, 2026

35 Days Left

WhatsApp