Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5658122 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Supply And Installation Body Shell Items & Partition Frames For Km/mc,tc,tc2/rvnl Coaches As Per Drg Nos, 1. 98310025, Alt 'nil' - 1 No, 2. 98310024, Alt 'a' - 2 Nos, 3. 98310006, Alt 'nil' - 3 Nos, 4. 98310023, Alt 'nil' - 1 No, 5. 98310005, Alt 'nil' - 1 No, 6. 99510004, Alt 'nil' - 8 Nos, 7. 99510003, Alt 'nil' - 8 Nos, 8. 98310010, Alt 'nil' - 3 Nos, 9. 99510001, Item 10, Alt 'nil' - 8 Nos. The Firm Shall Fulfil The Manufacturing Facility As Per Icf/md/spec-313, Issue Status-01,rev.01 Special Condition : Installation Required Annexure 'a' Dated 13.09.2023 To Be Followed 1. The Chair Pillars Shall Be Packed In Container As Per Icf/j&t/sk-1865 Alt'a'. 2. Other Partition Frames Not Fitting In The Container Shall Be Stacked One Over The Other, Secured Using Packing Strip And Placed In Steel Pallet. 3. The Height Of Each Stack Shall Not Exceed 750mm For Easy Handling. 4. Suitable And Sufficient Packing Strips To Be Used Such That Stacked Items Do Not Disintegrate During Transit, Storage And Handling. "there Will Be Minor Changes In The Drawings. The Supplier Shall Obtain The Latest Drawings Before Commencing Manufacturing". [safety Item ] |
| Last Date For Submission | 14th Oct, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
33 Days Left