Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5090575 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Supply Of One Coach Set Of End Part Air Conditioned Emu Trailer Coaches To Drg.nos. Emu/c/ac-1-1-002, Alt 'd' Col-i-1no, Emu/c/ac-1-1-003, Alt 'c' Col-i-1no. Special Condition : (i)themanufacturing Facility Requirement As Per Icf/md/spec-147, Issue Status-01, Rev-02, Amendment No.02. (ii)body Bolster To Drg.no. Icf/mrvc/c/ss-1-1-005, Alt 'h' Col.i To Be Provided Without A) Sidebearers To Drg.no. Emu/m-1-1-027, Alt 'l' Col.ii B) Grub Screws To Drg.no.icf/mrvc/c/ss-1-1-005,alt 'h' Item-8 And C) Side Bearer Covers To Drg.no. Emu/m-1-1-027, Alt 'l'item-1. (iii) The Underframe End Part Should Be Supplied With Normal Side Up And Side Bearer Side Down. Suitable Packing To Be Done To Avoid Damage During Transit, Unloading And Rust Prevention During Storage. Details For Stage Inspection. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Sole Bar With Cross Members. # Assembly Of Body Bolster Arrangement. # Welding Of Ribs With Sole Bar. # Placing &welding Of Top Sheet Arrangement. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuringproper Traceability. (c) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrosion. [safety Item ] |
| Last Date For Submission | 4th Aug, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
10 Days Left