Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5924763 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Supply Of One Coach Set Of Frame Work, Welding Parts And Carline For Vande Sleeper (a20) To Drgs No 1) Frame Work To Drgs No A2014008, Alt 'nil' - 1 No. A2014009, Alt 'nil' - 1 No. Items Called In Above Drgs In Column I To Be Supplied As Loose. 2) Welding Parts To Drgs No A2014010, Alt 'a' - 1 No A2014011, Alt 'a' - 1 No 3) Carline To Drgs No A1914010, Alt 'b' - 1 No. A1914011, Alt 'b' - 1 No. To Be Supplied As Coach Set Only. The Firm Shall Fulfil The Manufacturing Facility As Per Icf/md/spec-313, Issue Status-01,rev.01. The Firm Shall Fulfil The Manufacturing Facility As Per Icf/md/spec-316, Issue Status-01, Rev.00. Special Condition : 1. The Frame Work And Weld Parts Shall Be Packed In The Container/steel Pallet As Per Icf/j&t/sk-1865-alt 'b'. 2. The Weld Parts Shall Be Placed At The Bottom And Frame Work At The Top. 3. Other Partition Frames Not Fitting In The Container Shall Be Stacked One Over The Other, Secured Using Packing Strip And Placed In Steel Pallet. 4. Packing And Placing Of The Items To Be Such That The Frames Could Be Removed Easily From The Packing Prior To Weld Parts Without Any Damages. 5. The Height Of Each Stack Shall Not Exceed 750mm For Easy Handling. 6. Suitable And Sufficient Packing Strips To Be Used Such That Stacked Items Do Not Disintegrate During Transit, Storage And Handling. 7. Carline Packing Drg Icf/j&t/sk-1882, Alt 'b' [safety Item ] |
| Last Date For Submission | 13th Oct, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
8 Days Left