Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5277224 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Supply Of Shell Kit For Memu/tc6/cgpcil( Data Code 747) A. Roof Assembly - 74716005 000 01, Alt 'a' - 1 No, Location Of Sidewall - 74714001 000 01, Alt 'nil' - 1 No, End Construction -alarm End- 74715024 000 01, Alt 'nil' - 1 No, End Construction-non-alarm End-74715025 000 01, Alt 'nil' - 1 No. Firm Shall Fulfil The Manufacturing Facility As Per Icf/md/specn. 200, Issue Status 01, Rev 04 With Amendment No 01 Firm Shallfulfil The Manufacturing Facility As Per Icf/md/spec-315, Issue Status-01, Rev.00 With Amendment No 01. B. Body Shell Items. 1. 74710007, Alt 'c' Col-i - 2 Nos 2. 74710021, Alt 'nil' Col-i - 1 No 3. 74710018, Alt 'nil' Col-i- 2 Nos 4. 74710019, Alt 'nil' Col-i - 2 Nos 5. 74710020, Alt 'a' Col-i - 2 Nos 6. Aaa10278, Alt 'nil' - 4 Nos. C. Underframe Complete For Memu/tc6 Coach To Drg No. (747) Memu/tc6-1-1-001, Col-2, Alt 'g'- 1 No. Firm Shall Fulfil The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01 Rev.02 With Amendment No.02. Special Condition : Packing As Per Icf/j&t/misc-2201,alt 'f'. Packing As Per Icf/j&t/sk-1809,alt 'a'. Packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt 'b'. The Underframe Should Be Supplied As Normal Side Up & Sidebearer Side Down. Packing Condition As Per Icf/j&t/sk-1865, Alt 'a'. Stage Inspection. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item ] |
| Last Date For Submission | 13th Aug, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
3 Days Left