Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5164214 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Supply Of Transom Complete For Air Spring Suspension Bogie To Drg.no. Dc/emu/m/asr-0-3-003/col.vi, Alt 'n'---without Top Flange To Drg.no. Aaa03501, Item 1 The Firm Shall Fullfill The Requirements As Per Icf/md/specn.147, Rev-02.with Amendment No.1. Painting Not To Be Applied For 50mm Around Transom Welding Area. Special Condition :-suitable Packingto Be Done To Avoid Damage During Transit, Unloading And Rust Prevention During Storage. [ Warranty Period: 30 Months After The Date Of Delivery ] |
| Last Date For Submission | 28th Aug, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
28 Days Left