Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5369018 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Supply Of Under Frame Complete For Vbs/ndtc/cb To Drg No A09 11001, Alt 'nil'. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01, Rev.02 With Amendment No.02. For Painting Note 1.2 Of Drg No (538)lwlrrm-1-1-116, Alt 'e' To Be Followed---- Special Condition : The Under Frame Should Be Supplied As Normal Side Up And Side Bearer Side Down.- Packing To Be As Per Icf/j&t/misc-2487, Alt 'b' "there Will Be Minor Modifications In Design. Frim Shall Obtain The Final Drawings Before Manufacturing". Details For Satge Inspection. A Raw Material Stage Ensure The Raw Material Used Usingportable Spectrometer B Jig Stage Assembly Of Front Part With Solebar. Assembly Of Modular Frame Arrangement. Weld Parameters To Be Checked & Recorded C Trestle Stage Marking, Drilling & Tapping Of Holes Wherever Necessary. Marking & Placing Of Detail Items. Complete Welding Wherever Necessary. Weld Parameters To Bechecked & Recorded Assembly & Welding Oftrough Sheets. Dimensional & Visual Checks. Punching Of Serial No & Ensuringproper Traceability. D Surface Preparation And Painting Stage. Short/sandblast To The Requirements. Painting Process As Per The Specification. Visualinspection. Final Product Inspection. Note: Application Of Aluminium Weldingcoat To Rcf Spec Mdts 28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoidbi-metalliccorrosion.[safety Item ] |
| Last Date For Submission | 23rd Sep, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
37 Days Left