Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5338864 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Supply Of Under Frame Cpl For Lws/bw2 Coach With Direct Mount Bio Toilet Tank To Drg No. 75211001, Alt 'nil' Col 1. Firm Shall Fulfil The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01 Rev.03. For Painting As Per Note 1.2 Of Drg No 53811116, Alt 'e'. Special Condition : The Underframe Should Be Supplied As Normal Side Up And Side Bearer Side Down. Packing Condition As Per Drg No. Icf/j&t/misc-2487, Alt 'b'. Details For Stage Inspection. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminiumwelding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion.[safety Item ] |
| Last Date For Submission | 11th Sep, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
28 Days Left