Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4415923 |
|---|---|
| Organisation Name | Western Coalfields Limited |
| Tender Brief | Corrigendum : Modification Of Existing Playing Ground At Prc/sti By Developing Chain Link Fencing Levelling Of Surface Along With Re-claimation Of Waste Land Renovating Existing Abandoned Hall / Room Into Indoor Chess Table Tennis Playing Room Providing Open Gym. |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 43900.00 |
| Estimated Cost | 3508268.00 |
| City | Chhindwara |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil. | 1018.23 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand(zone III) : 6 graded stone aggregate 40 mm nominal size) | 6.65 | Cum |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.00 | cum |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars | 60.00 | kg |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete . | 20.00 | Sqm |
3 Days Left