| # | Item | Qty | Units |
|---|---|---|---|
| 1 | MSB - CIVIL WORKS | ||
| 2 | SUB HEAD 1.0 : EARTH WORK | ||
| 3 | Note:- During the excavation if required Contractor has to arrange & run Dewatering Bore to maintain site water table below 1 mtr from deepest foundation level including casing, perforated pipes, soil filter, Submersible pumps, connecting wire, including all tools and tackles, connecting the discharge pipe to nearest drain from site premises. Contractor must ensure all safety and ensure backup pumps in case of any breakdown. The complete system is to be installed as per Engineer's satisfaction. Cost is inclusive of Providing and running Diesel Generator (1 Running/ 1 Standby) with required fuel. Contractor has to arrange & maintain temporary drainage system till completion of Foundation casting & curing period of foundation. disposal of extracted water in accordance with environmental regulations; and restoration of the site post-dewatering. All work should comply with relevant safety standards and local regulations, ensuring minimal disruption to the surrounding environment and structures. No extra amount shall be claimed by the contractor on this account and his quoted rates shall be deemed to include dewatering if required. The Contractor to make his assessment for the same. | ||
| 4 | During the excavation if required Contractor has to arrange & shoring with suitable method. Contractors should give their proposal for method of shoring & get approved from the Engineer-in-charge/ Architect before commencement of excavation at site. No extra amount shall be claimed by the contractor on this account and his quoted rates shall be deemed to include shoring if required. The Contractor to make his assessment for the same. Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto50 m and lift upto 1.5 m. | ||
| 5 | All kinds of soil | 6097.00 | Sqm |