Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Indo Tibetan Border Police
Tender ID4446276
Organisation NameIndo Tibetan Border Police
Tender BriefCreation Of Infrastructure Of Tactical Head Quarter (thq) At The Camp Of 11th Bn Itbp Situated At An Altitude Of10400 Feet And A Distance Of 33 Km From Chungthang, Distt. Mangan, North Sikkim. Camp Connected By Road.
Last Date For Submission22nd Jun, 2026
Opening Date23 Jun, 2026
Cost
Document Cost0.00
EMD446452.00
Estimated Cost22322605.00
Location
CityChungthang
StateSikkim

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil544.68cum
2Earth work in excavation by mechanical means (Hydraulic excavator)/manual mean foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.80.60cum
3Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms,lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock80.60cum
4Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m .Ordinary rock Pipes Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia175.00Mtr
5Filling available excavated earth ( excluding rocks) in plinth side of foundation, under floors in layers not exceeding 20 cm in depth including, watering, ramming consolidating and dressing completelead up to 50 m and lift up to 1.5 m,545.61cum
22nd Jun, 2026

22 Days Left

WhatsApp