Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: NHPC Limited
Tender ID4014203
Organisation NameNHPC Limited
Tender BriefCorrigendum : Repairing Of Loktak-leimatak Road From Rd 8.000 Km To Rd 12.000 Km Of Loktak Project.
Last Date For Submission13th May, 2026
Opening Date18 May, 2026
Cost
Document Cost1180.00
EMD163000.00
Estimated Cost8160981.00
Location
CityChurachandpur
StateManipur

Register to see full details

BOQ Items
#ItemQtyUnits
1Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 meters (i) Mechanical Means using Hydraulic excavator.12153.89Sqm
2Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m.3693.89Sqm
3Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam Specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means ) Grading-I (a) Using Screening Crushable type such as Moorum or Gravel.93.63Cum
4Filling Pot-holes and Patch Repairs with - Bituminous concrete, 40mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2) (i) for grading I Material.58.60Sqm
5Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. 16.30.2 On bituminous surface @ 0.50 Kg / sqm.8600.00Sqm
13th May, 2026

6 Days Left

WhatsApp