Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4558367 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair / Maint Of Ac, Geyser And Other Appliances With Connected Items Under Ge Clement Town |
| Last Date For Submission | 7th Jul, 2026 |
| Opening Date | 14 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 40000.00 |
| Estimated Cost | 2000000.00 |
| City | Clement Town |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Identifying and rectifying the minor defect/complaints of any type and nature such as rectification of faulty electric circuit, tightening of loose wiring & connection pertaining to all type of Air conditioner/ Geyser/ desert cooler/ Water Coolers/Refrigerator / Deep Freezer of any type and any capacity including servicing, cleaning, and removing dust by air blower and washing with required solution complete all as specified and directed for the item included following:-. (a) All T & P and labour team required comprising of Nos of trained electricians & helpers will be provided by the contractor daily as directed. (b) Cost of minor stores such as screws,clamps,insulation tapes,nuts/bolts, nail of required size etc shall be deemed included in the rate of quoted item. (c) Any part need to be replacement will be measured and paid seprately as per respective item of schedule. | 120.00 | Each job |
| 2 | WATER COOLERS Supply, installation and commissioning of water cooler partially stainless steel electric driven single phase having approx storage and normal cooling capacity 40/80 Ltr. | 3.00 | Each |
| 3 | Supply, installation and commissioning of water cooler partially stainless steel electric driven single phase having approx storage and normal cooling capacity 60/120 Ltr. | 3.00 | Each |
| 4 | S&F in repair sealed compressor unit of any make any type for water cooler of cap 40 Ltrs/hr by cutting of suction and discharge lines and unscrewing the foundation nuts & bolts etc, and fixing with new sealed compressor unit by tightening the foundation nuts and bolts and connecting suction and discharge line with gas welding work etc and checking the leakage in the system and charging the gas R-22 / R-134 upto required pressure and tightening foundation nuts & bolts etc complete all as specified and directed. | 8.00 | Each |
| 5 | All as per item No. 04 here in before but for water cooler of capacity 60 Ltrs/hr complete all as specified and directed | 7.00 | Each |
6 Days Left