Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4181432 |
|---|---|
| Organisation Name | Southern Railway |
| Tender Brief | Supply Of Components For Key Lock E Type (drg.no.cwm 01806 Alt-1) In Set. One Set Consists Of 1) Base Todrg.no. Cwm 02006:- 1 No 2) Stud A To Drg.no.cwm 02106 Alt-1:- 1 No 3) Stud B To Drg.no. Cwm 02206 Alt-1:- 2 Nos 4) Grooved Pin To Drg.no.cwm 02306 Alt-1:- 1 No 5) Stud C To Drg.no.cwm 02406 Alt-1:- 1 No 6) Tumbler :- 3 Nos (tumbler No.1 To Drg.no.cwm 02506, Tumbler No.2 To Drg.no. Cwm 02606, Tumbler No.3 To Drg.no. Cwm 02706) 7) Modified Tumbler Spring To Drg.no. Cwm 12124:- 3 Nos 8) Modified Spring To Drg.no. Cwm 12224:- 1 No 9) Lock Bolt:- 1 No (lock Bolt To Drg.no. Cwm 02906 Alt-1, Lock Bolt (spl) A To Drg.no. Cwm 02512 Alt-2, Lock Bolt (spl) B To Drg.no. Cwm 02612 Alt-2) 10) Cover Assembly To Drg.no. Cwm 03206 Alt-1:- 1 No 11) Operating Piece To Drg.no. Cwm 03006 Alt-2:- 1 No 12) Key To Drg.no.cwm 03806 Alt-1:- 1 No 13) Ch Hd Screw Ms M10x35 To Is:1366 With Spring Washer B10 To Is3063 & Hex Nut Msm10 To Is:1363 Part 3:- 2 Set14) Ch Hd Screw Ms M10x40 To Is:1366 With Spring Washer B10 To Is3063 & Hex Nut Msm10 To Is:1363 Part 3:- 1 Set (a) Requirement Of Ward Configuration For Sl.no. 10, 11 & 12 To Be Collected By The Supplier From The Consignee Before Commencement Of Production (b) Requirement Of Lock Bolts (sl.no.9) To Be Collected By The Supplier From The Consignee Before Commencement Of Production (c) Requirement Of Tumbler (sl.no.6) To Be Collected By The Supplier From The Consignee Before Commencement Of Production (d) Item No 1 To 8 Shall Be Packed In Sets. (e) Item No. 10 To 12 Shall Be Packedseparately As Per Ward Configuration (f) Lock Bolt, Lock Bolt (spl) A & Lock Bolt (spl) B Are To Be Packed Separately [ Warranty Period: 30 Months After The Date Of Delivery ] |
| Last Date For Submission | 9th Jun, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Coimbatore |
|---|---|
| State | Tamil Nadu |
35 Days Left