Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3043304 |
|---|---|
| Organisation Name | East Central Railway |
| Tender Brief | Corrigendum : Dismantling And Stripping Of Existing Complete Set Of Bellow Duct From Coach Side And Rmpu Side With Supply, Installation And Commissioning Of Complete Set Of Bellow Duct Made Of Meta Aramid / Para Aramid Fabric With Silicon Rubber Coating On Both Sides Complete With Metallic Framesat Both Ends As Per Rdso Specification No. Rdso/pe/spec/ac/0197-2020 (rev.- 0) And As Per Icf Drawing No. Icf/sk3-7-6-072 Alt.-a Type-i, Complete With Accessories Of Various Makes Of Rmpu Of Lhb Type Ac Coaches. (one Complete Coach Set Comprises 02 No. Supply Air Bellow, 04 Nos. Fresh Air Bellows & 04 Nos. Return Air Bellows I.e. Total 10 Nos.). Guarantee / Warranty - 60 Months From The Date Of Delivery. [ Warranty Period: 60 Months After The Date Of Delivery ] |
| Last Date For Submission | 30th Apr, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Refer Documents |
|---|---|
| State | Multi State |
16 Days Left