Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4856235 |
|---|---|
| Organisation Name | Municipal Administration And Water Supply Department |
| Tender Brief | Attending And Repairing Of Rewinding Submersible Motor Different Type Of Pumpsets At Ward 16 To 30 Nellikuppam Municipality. |
| Last Date For Submission | 22nd Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 4500.00 |
| Estimated Cost | 450000.00 |
| City | Cuddalore |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Labour charges for the removal of submersible pumpset in borewell/openwell for attending repair.including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days-For repairing of pumpset. 50% Rate from The TWAD SOR 25-26 UPTO 5HP | 1.00 | No |
| 2 | Above 5 HP to 10.00 HP | 1.00 | No |
| 3 | Above 10 HP to 20.00 HP | 2.00 | No |
| 4 | Above 20 HP to 30.00 HP | 2.00 | No |
| 5 | Labour charges for the Re-erection of submersible pumpset in borewell/openwell. including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days-For repaired pumpset. 50% Rate from The TWAD SOR 25-26 Upto 3HP | 1.00 | No |
15 Days Left