Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: District Rural Development Agency
Tender ID4212557
Organisation NameDistrict Rural Development Agency
Tender BriefCorrigendum : Construction Of Toilet Block At Arulmigu Parvathavarthini Sametha Sri Ramalingaeswarar Devasthanam, Nettapakkam, Puducherry.
Last Date For Submission20th May, 2026
Opening Date21 May, 2026
Cost
Document Cost525.00
EMD5704.00
Estimated Cost285196.00
Location
CityCuddalore
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Code NO.2.8.1 Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil4.00Cum
2Code NO.2.27B Supplying and filling with red earth (excluding rock) including cost and conveyance to the work site and stacking to the departmental gauge , spreading in layers not exceeding 20cm in depth , watering and consolidation using 0.5 tonne roller , or wooden or steel rammers etc. complete for making play fields , running tracks and court yards1.00Cum
3Code NO.4.1.10 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 fine aggregate : 10 graded stone aggregate 40mm nominal size)1.50Cum
4Code NO.4.17 Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 fine aggregate : 6 graded stone aggregate 20mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine aggregate, including necessary excavation, levelling and dressing &finishing the top smooth.3.00Sqm
5Code NO.5.1.2 Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering , shuttering , finsishing and reinforcement - All work upto plinth level 1:1.5:3 (1cement : 1.5 fine aggregate : 3 graded stone aggregate 20 mm nominal size)1.00Cum
20th May, 2026

5 Days Left

WhatsApp