Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4364523 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Protection To The Road Side Embankment Due To Landslide On State Highway 06 With Road Id 65747 For A Length Of 110m In Curchorem Constituency In Quepem Taluka. |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 6000.00 |
|---|---|
| EMD | 99311.00 |
| Estimated Cost | 4965506.00 |
| City | Curchorem |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation for roadway in all types of strata comprising any of the materials such as soil, silt, clay gravel murrum of all varieties shingles pebbles all types of conglomerates, laterite rock, ordinary soft rock, disintegrated rock fissured rock shuttered decomposed rock or weathered rock and all such other materials as described under Appendix "A" to those specification either in full or parts as the case may be by with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers or any approved method or method as the case may be convenient or permitted including cutting and pushing the earth to site of embankment for all leads including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.as per MORTH Specification 301and inclusive of chiselling, wedging, blasting prohibited etc. in all conditions such as dry moist saturated submerged foul conditions etc. and as directed by the Engineer in - charge including dressing of sides ramming of bottoms including getting out the excavated soft/rock to be levelled & neatly dressed including pumping and bailing of water barricading danger lighting guarding and disposal of excavated earth as directed by the Engineer - in Charge including all leads and lifts etc. complete | 385.00 | Cu.m |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 55.00 | Cu.m |
| 3 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete. | 477.00 | Sq.m. |
| 4 | b) Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | 410.00 | Sq.m. |
| 5 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : a) All works upto plinth level | 467.00 | Cu.m |
13 Days Left