Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4368297 |
|---|---|
| Organisation Name | Odisha Industrial Infrastructure Development Corporation |
| Tender Brief | Construction Of Approach Road And Cleaning Of Bushes And Shrubs At Bachhapur Industrial Estate,cuttack |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 06 Jun, 2026 |
| Document Cost | 7080.00 |
|---|---|
| EMD | 20363.00 |
| Estimated Cost | 0.00 |
| City | Cuttack |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including prooting rank vegetation, grass, bushes. shrubs, saplings and trees of girth up to 300 mm, removal of existing stumps of trees dead cut earlier stacking serviceable material for use or auction within the road land & disposal of all unserviceable material including removal top 150mm thick organic soil away from the road land as under Clause no. 201 & Section 200. section 100 & CL.112 of techowal specification Part spexibeation for Road & Bridge work of MORTall (5th revision) including full Jcompensation inclusive costs for all (18 Acre 72843 sqmt) | 72843.00 | Cum |
| 2 | Construction of Embankment with approved material obtained from borrow pits with all lift and leads, transporting, to site by mechanical means within a lead of 10kms spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoSRT & H Speciefication for Road & Bridge works | 1440.000 | cum |
| 3 | Granular Sub-Base with Close Graded Material (Table:- 400-1)Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 66.000 | cum |
| 4 | Cement concrete (1:3:6) with 4cm size H. G. Metal | 9.480 | cum |
| 5 | Laying and fixing in position R.C.C.Hume pipes NP-4 with collars jointed with cement mortar 1:3 complete as per Direction of EIC | 40.000 | Mtr |