| 1 | Clearance of weeds, lipomia, water hyacinth (thickly grown) from the drainage channel and dumping the clearance materials away from the drainage area within 50 mtr initial lead and 1.5mtr initial lift as per the direction of the Engineer-in-charge. | 21280.00 | One Sqm |
| 2 | Earth work excavation loading unloading & carriage by mechanical means in all kind of soil including rough dressing and leveling the bed and depositing the excavated earth away from work site within initial lead of 50 m.and initial lift 1.50 m. including bailing out water, including cost, conveyance, royalty and taxes of all materials and labour, supervision, overhead charges, contractor profit, mobilization, demobilization etc. as per the direction of the Engineer-in-charge. | 26558.50 | One Cum |
| 3 | Providing rough stone dray packing in foundation and plingth with hard granite stone of 0.025 Cum size with sand grouting in any direction free from weather skin surface to proper line and level including filling the inter spices with required broken stone spols with all leads, lift & delifts including cost, carrage, royalities, Taxes of all materials and labour for dressing of earth work in bed and slopes and trimming to the required profile including dewatering if required etc complete with all incidental charges as per drawing design and specification and as per the Direction of the Engineering -in -charge. | 63.72 | One Cum |
| 4 | Cement Concrete M-15 grade with 40mm nominal size stone aggregates free from weathered skin surface and any other deleterious materials, using sharp coarse sand of approve grading & quality confirming to the specifications, using water of approved quality & using cement as per approved specification with all leads, lifts, delifts & transportation by mechanical / manual means, including cost, conveyance, royalties & taxes of all other materials labours supervision overhead and contractor profits including with dewatering by suitable means with all cost, mixing the concrete mix ingredients in concrete mixer, vibration of concrete by mechanical means, supplying T & P, watering, curing for specified days by suitable means including cost & carriage of water, construction of coffer dam / approach road, diversion road, mobilization & demobilization of men & hire and running charges of all machineries and equipments etc. including quality control testing charges as per approved drawing, design, specification & direction of the Engineer-in-Charge. | 159.10 | One Cum |
| 5 | R.C.C. work of M-25 grade in approved surface using 20mm down graded H.G. crusher broken well graded stone aggregates free from weathered skin surface and any other deleterious materials, using sharp coarse sand of approve grading & quality confirming to the specifications, using water of approved quality & using cement as per approved specification with all leads, lifts, delifts & transportation by mechanical / manual means, including cost, conveyance, royalties & taxes of all other materials labour supervision overhead contractor profit including with dewatering by suitable means with all cost, mixing the concrete mix ingredients in concrete mixer, vibration of concrete by mechanical means, supplying T & P, watering, curing for specified days by suitable means including cost & carriage of water, construction of coffer dam / approach road, diversion road, mobilization & demobilization of men & hire and running charges of all machineries and equipments etc. including quality control testing charges as per approved drawing, design, specification & direction of the Engineer-in-Charge. | 272.80 | One Cum |