| Tender ID | 4025955 |
|---|---|
| Organisation Name | Directorate Of Local Bodies |
| Tender Brief | Corrigendum : Construction Of Side Patri By Interlocking Tiles On The Footpath Along The Right Side Of G.t. Road, From The House Of Dharmveer Bhati Bodaki-wale Up To The Nagar Palika Limit Board. |
| Last Date For Submission | 15th May, 2026 |
| Opening Date | 16 May, 2026 |
| Document Cost | 21004.00 |
|---|---|
| EMD | 1777600.00 |
| Estimated Cost | 17776000.00 |
| City | Dadri |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil(loam,clay or sand)including lift upto 1.50M and lead 30M and including filling watering and ramming of excavated earth into the trenchesor into the space between building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in chrge upto a distance of 30M from the foundation trenches 251(a) | 1856.00 | M3 |
| 2 | M-150 Brick work in cement mortar in proportion pf 1:4 (1cement and 4 coarse sand) in foundation & plinth including supply of all material, labour, T&P etc required for propercomletion of the wprk.as per S.I.No. 305a | 42.00 | M3 |
| 3 | 12mm thick plaster with cement and coarse sand pf 2.20 fineness modules in 1:4 over brick work minumum thickness not to be less than 1cm. Including supply of all materials, labour, tools & plant etc. required for proper completion of the work. As per S.I. No.584 | 120.00 | M2 |
| 4 | cement concrete with 2 cm gauge approved stone ballast coarse sand & cement in the proportion of 4:2:1 Including supply of all materials, labour, tools & plant etc. required for proper completion of the work. As per S.I. No. 279a | 9.20 | M3 |
| 5 | construction of granular sub-base by providing coars graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at desired density, including cost of all material, labour, T&P including all taxes, royalty, labour cess complete, as per mort clause. (A.R.) | 1392.00 | M3 |