Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Roads And Buildings Department
Tender ID4405521
Organisation NameRoads And Buildings Department
Tender BriefMaintenance And Repairing Of Various Roads Under (r & B) Sub Division, Dahod / Limkheda Dist. Dahod. (supplying Hotmix Material, Quarry Materials For Patch Work, Hiring Machinery, Concrete Works And Miscellaneous Works) (for Taluka : Dahod, Garbada, Zalod, Fatepura, Sanjeli, Limkheda, Devgadh Baria, Dhanpur, Singvad)
Last Date For Submission6th Jun, 2026
Opening DateRefer to Documents
Cost
Document Cost2400.00
EMD50000.00
Estimated Cost0.00
Location
CityDahod
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing and applying priming coat using slow setting emulsion asphalt at the rate of 7.5 kg/10 sq.mt. on water bound macadam / W.M.M. surface including cleaning the suyrface etc. complete.1.000SqMt
2Providing and laying 37.5mm thick Bituminous Macadam with B.T. aggregate as per MORTH specification and using emulsion RS-1 as per IS 8887: for tack coat @ 2.50 kg/ 10 sq.m. with mechanical sprayer and Bulk asphalt VG-30 for mixing @ 34.00 Kg / M.T. i.e. 3.40 percentage of total weight of mix including heating and mixing the aggregate and asphalt in continuous of drum mix plant and hot laid process spreading the same by paver finisher and consolidation with roller as per MORTH spcification to achieve desire density, including providing all materials equipments, tools and plants, fire wood, oil, kerosene, labour charges etc. complete using contractor's own machinery drum mix plant and paver finisher etc. complete.1.000MT
3Providing and laying 50mm thick Bituminous Macadam with B.T. aggregate as per MORTH specification and using emulsion RS-1 as per IS 8887: for tack coat @ 2.50 kg/ 10 sq.m. with mechanical sprayer and Bulk asphalt VG-30 for mixing @ 34.00 Kg / M.T. i.e. 3.40 percentage of total weight of mix including heating and mixing the aggregate and asphalt in continuous of drum mix plant and hot laid process spreading the same by paver finisher and consolidation with roller as per MORTH spcification to achieve desire density, including providing all materials equipments, tools and plants, fire wood, oil, kerosene, labour charges etc. complete using contractor's own machinery drum mix plant and paver finisher etc. complete.1.000MT
4Providing and laying 25mm thick Semidence Bituminous concrete with B.T. aggregate as per MORTH specification and using Bulk asphalt grade VG-30 mixing @ 50.00 Kg / M.T. i.e. 5.00 percentage by total weight of mix including heating and mixing the aggregate and asphalt in continuous of drum mix plant and hot laid process laying with paver finisher and consolidation with roller as per MORTH spcification to achieve desire density, including all materials equipments, tools and plants, fire wood, oil, kerosene, labour charges etc. complete using contractor''s own machinery drum mix plant and paver finisher etc. complete.1.000MT
5Providing and laying 20 mm thick average for patchwork Mix seal surface using stone chips @66 percentage by weight, gradation as per MORTH specification and using bitumin VG-30 grade of tack coat @ 2.50 kg/10 sqm & for mixing at rate not less then 50.90KG/MT on BT surface using stone chips as per MORTH specification including heating the ashphalt and aggregates by hot mix plant and spreading the same bt paver finisher including consolidation wit vibratory roller and providing, operating plant machinaries, equipments, tools, plants, oil, fire wood, kerosene and all labour charges etc. complete.1.000MT
6th Jun, 2026

10 Days Left

WhatsApp