Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: National Aluminium Company Limited
Tender ID4458256
Organisation NameNational Aluminium Company Limited
Tender BriefCorrigendum : Construction Of Pile Foundation For 4 Numbers Caustic Tank In Alumina Refinery, Nalco, Damanjodi
Last Date For Submission6th Jul, 2026
Opening Date08 Jul, 2026
Cost
Document Cost0.00
EMD565000.00
Estimated Cost0.00
Location
CityDamanjodi
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
11.1.1/P66) Removing the excavated materials,debris of any description and any other waste materials,spoil including loading into trucks/tractors using baskets by head load or any other means and transporting by trucks/tractors and unloading at the earmarked places, spreading / levelling complete and disposal inside plant within 1 KM lead.870.00Cum
202.08.01) Earth work in all kinds of soil in foundation, trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the excavated soil and disposal of surplus earth as directed within a lead of 50 M. Disposed soil to be levelled and neatly dressed. for Lift upto 1.5 m in all type of soil.690.00Cum.
302.08.01/2.26.1) Earth work in all kinds of soil in foundation, trenches or drains including dressing of sides and ramming of bottoms , lift from 1.5m to 3.00m including getting out the excavated soil and disposal of surplus earth as directed within a lead of 50 M. Disposed soil to be levelled and neatly dressed. for Lift from 1.5m to 3.00 m in all type of soil.200.00Cum.
402.09.01) Earthwork excavation in soft rock / ordinary rock in foundations not exceeding 1.5m in width or 10 Sqm. on plan including dressing of sides and ramming of bottoms lift as mentioned above including getting out the excavated soil and disposal of surplus earth as directed within a lead of 50m. Disposed soil to be levelled and neatly dressed.Lift upto 1.50m in ordinary / soft rock.50.00Cum.
502.09.01/2.26.2) Earthwork excavation in soft rock / ordinary rock in foundations , drains including dressing of sides and ramming of bottoms lift as mentioned above including getting out the excavated soil and disposal of surplus earth as directed within a lead of 50m. Disposed soil to be levelled and neatly dressed.Lift from 1.5m to 3.00m in ordinary / soft rock.50.00Cum.
6th Jul, 2026

11 Days Left

WhatsApp