Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3850375 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provn Of Solid Waste Management System At Bengdubi Mil Stn Under Ge Bengdubi |
| Last Date For Submission | 30th May, 2026 |
| Opening Date | 01 Jun, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 527200.00 |
| Estimated Cost | 45218000.00 |
| City | Darjeeling |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | NOTE (Applicable for all Parts/ Items):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. | ||
| 2 | SCHEDULE "A" Part - I (BUILDING WORK ) Lump sum price worked out by the Contractor for Design, Drawings and Construction of Storage Shade of area 1269 Sqm for Waste managment system including Soil Investigation With SPT method for 2 boreholes of 10 m depth complete as mentioned in Architectural / Line Plan drawings complete all as specified and shown on drawing and scope of work and other documents of the Tender and as mentioned in Annexure I of scope of the work as listed in Schedule A Part-I NOTE : (a) Section 'A' is not prepriced by MES and the rate indicated as "0.00" under Col-5 signifies this fact only. (b) The quoted rates against the items under this schedule are deemed to include for the provisions contained in Scope of Work and Sch 'A' Notes. Ref Sch 'A' Notes complete before quoting these items. Structural designs and architectural/ structural drawings for structures and foundations for the buildings/ structures shall be prepared to comply with the provisions for design and analysis of RCC structures as per latest editions of relevant IS Codes with and including Soil Investigation shedule 'A' Part-I. | 1.00 | Complete Job |
| 3 | SCHEDULE 'A' PART-II (SITE CLEARANCE , DEVELOPMENT EARTH WORK AND EXCAVATION) Details of prepriced Schedule is given in tender documents. Representing ** _____ % ______ percent *Above / Below the lump sum price of Rs. 1000692.59 Inserted by the MES in Schedule 'A' Part-II. | 1.00 | Lump sum |
| 4 | SCHEDULE 'A' PART-IIl (ROAD/PATH/HARDSTANDING/CULVERT) Details of prepriced Schedule is given in tender documents. Representing ** _____ % ______ percent *Above / Below the lump sum price of Rs. 6850676.7 Inserted by the MES in Schedule 'A' Part-III. | 1.00 | Lump sum |
| 5 | SCHEDULE 'A' PART-lV (INTERNAL ELECTRIFICATION) Details of prepriced Schedule is given in tender documents. Representing ** _____ % ______ percent *Above / Below the lump sum price of Rs. 174722.32 Inserted by the MES in Schedule 'A' Part-IV. | 1.00 | Lump sum |
14 Days Left