Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4848114 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs To Sewage Line, Septic Tank, Retaining Wall, Hard Standing Work, Street Light And Connected Works At 799 Su Af Stn And Periodical Services And Certain B/r Works At Af Stn Kurseong Under Ge (af) Bagdogra |
| Last Date For Submission | 1st Aug, 2026 |
| Opening Date | 03 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 85000.00 |
| Estimated Cost | 4250000.00 |
| City | Darjeeling |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cleaning and removing of blockage of any type of sludge /efflucent etc in sewage pipe line of 150mm internal dia from manhole and well flushing with water manually with the help of green bamboo or any other mechanical method as deemed fit including taking off and replacing manhole cover etc. complete all as specified and directed. (Depth of manhole n.exc 1.50 Mtr). | 900.00 | RM |
| 2 | All as per ser item No 1 above, but depth of manhole ex. 1.5 m to 3.00 m complete all as specified and directed. | 250.00 | RM |
| 3 | Cleaning of blockages from Nahani trap to Gully trap by Roding etc and cleaning the sludge from NT taking up and refixing the grating in CM (1:3) including testing by pouring the water until smooth flow complete all as specified and directed. Note:- Each time cleaning of blockage shall be paid and measured separately. | 250.00 | Each job |
| 4 | Cleaning of blockages from Gully trap to 1st Manhole length of sewer line not exceeding 5m by rodding etc and cleaning all sludge from Gully trap to 1st Manhole including pouring water until the smooth flow and necessary earth work and disposed of sludge etc complete all as specified and directed. Note:- Each time cleaning of blockage shall be paid and measured separately. | 200.00 | Each job |
| 5 | Cleaning of blockages from water closet including cleaning the soil pipe by removing the access door cover in the bend and refixing it after cleaning the pipe, pouring water until smooth flow etc complete all as specified and directed. Note:- Each time cleaning of blockage shall be paid and measured separately. | 350.00 | Each job |
6 Days Left