| Tender ID | 4779301 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Corrigendum : Renovation Of Main Canal From One Km To Two Km Kalakho Dam Village Kalakho Dist Dausa |
| Last Date For Submission | 24th Jul, 2026 |
| Opening Date | 27 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 92000.00 |
| Estimated Cost | 4563000.00 |
| City | Dausa |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 1075.00 | Sqm |
| 2 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | 358.60 | Cum |
| 3 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 9542.69 | Kg. |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil | 275.00 | Cum |
| 5 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m ( Km) Deduct in item no 16 (a) to (d) above if Standard Proctor s density to be achived is at least 95 | 940.72 | Cum |