Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Health Engineering Department
Tender ID4808561
Organisation NamePublic Health Engineering Department
Tender BriefCorrigendum : Construction And Commissioning Of 200mm Dia Three Phase Tube Well On Annual Rate Contract Basis In Sandy Strata Including Defect Liability Period Of Two Years In Urban And Rural Area Of District Deeg
Last Date For Submission21st Jul, 2026
Opening Date22 Jul, 2026
Cost
Document Cost1000.00
EMD300000.00
Estimated Cost15000000.00
Location
CityDeeg
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water.
2Nominal bore 200 mm dia.1.00Per Mtr
3Add 15% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and up to 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr.1.00Per Mtr
4Add 40% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 200 mtr, rate shall be applicable for only extra depth beyond 200 mtr .1.00Per Mtr
5Construction of Tube Well from ground level and up to 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe.
21st Jul, 2026

11 Days Left

WhatsApp