Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4832260 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Construction Of Bridge From Mdr 42 To Roshangaon Patoda Kh Babhali Upto Sh 260 Road Odr 71 At Km 7/500 Tq Dharmabad |
| Last Date For Submission | 6th Jul, 2026 |
| Opening Date | 07 Jul, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 160100.00 |
| Estimated Cost | 16010000.00 |
| City | DEGLOOR |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for foundation including shoring and strutting as necessary and disposing off excavated stuff as directed in earth, sails of all types, sand gravel soft murum etc complete (excluding dewatering if separately provided etc. complete) as directed by Engineer in charge for depth of 1.5 M Spec. Na BR-3 Page No 102 Note Add 5% for depth for 1.50 m 300 m. Add 10% for depth for 3.00 m to 6.00 m. Add 15% for depth above 6.00 m | 986.500 | Hour |
| 2 | Excavation for foundation including shoring and strutting as necessary and disposing off excavated stuff as directed in earth, sails of all types, sand gravel soft murum etc complete (excluding dewatering if separately provided etc. complete) as directed by Engineer in charge for depth of 1.5 M Spec. Na BR-3 Page No 102 Note Add 5% for depth for 1.50 m 300 m. Add 10% for depth for 3.00 m to 6.00 m. Add 15% for depth above 6.00 m | 656.680 | Hour |
| 3 | : Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 5.0 to 9.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) | 75.560 | Hour |
| 4 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 10.0 to 19.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) | 75.560 | Hour |
| 5 | : Providing and filling sand in foundation trenches / below Raft as per drawing and technical specifications etc. complete. (Coarse Sand and Gravel ) | 197.480 | Cubic Metre |
2 Days Left