Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Mussoorie Dehradun Development Authority
Tender ID5017162
Organisation NameMussoorie Dehradun Development Authority
Tender BriefConstruction Of Interlocking Tiles Road And Shade In Principal At Kargil Shahid Rajiv Pundir Govt. Inter College, Vikasnagar, Dehradun
Last Date For Submission30th Jul, 2026
Opening Date30 Jul, 2026
Cost
Document Cost1180.00
EMD29910.00
Estimated Cost0.00
Location
CityDEHRADUN
StateUttarakhand

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil27.000Cum
2Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana I Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate I retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum7.210Cum
3Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-5000 or more.848.980Kg
4Providing and fixing bolts including nuts and washers complete.91.010Kg
5Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes2040.720Kg