Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5023655 |
|---|---|
| Organisation Name | Pey Jal Nigam Uttarakhand |
| Tender Brief | Construction Of Multipurpose Hall At Kotdwar, Uttarakhand |
| Last Date For Submission | 11th Aug, 2026 |
| Opening Date | 12 Aug, 2026 |
| Document Cost | 11800.00 |
|---|---|
| EMD | 1207000.00 |
| Estimated Cost | 60339000.00 |
| City | DEHRADUN |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | DSR Item- 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. :All kinds of soil. | 921.58 | Cum |
| 2 | DSR Item- 2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 817.38 | Cum |
| 3 | DSR Item- 2.25(a) Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20cm in trenches, plinth, sides of foundation etc. complete. | 35.75 | Cum |
| 4 | DSR Item- 2.27 Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. | 87.75 | Cum |
| 5 | DSR Item- 2.35.3.1 Diluting and injecting chemical emulsion (Chlorpyriphos/Lindane E.C. 20% with 1% concentration), at the rate of one litre per hole at 300 mm c/c to all the horizontal and vertical surfaces of the excavations made for the foundation of the building, soil under floors, apron, back fill material and along all the faces of the walls for PRE-CONSTRUCTIONAL anti-termite treatment (including the cost of chemical emulsion) as per IS:6313 Part-II. (Plinth area of Building shall be measured for Payment) | 906.40 | Sqm |
21 Days Left