Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3609822 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Petty Repairs Rewiring Of All Internal Electic Supply Of Building Including Submain, Repair Of All Types Of Fans, Geysers, Acs, Coolers, Garden Lights, Building Security Lights Etc And Allied Maint Works In Technical And Residential Area At Irde Un |
| Last Date For Submission | 1st Apr, 2026 |
| Opening Date | 03 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 24460.00 |
| Estimated Cost | 1223000.00 |
| City | DEHRADUN |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Disconnecting, dismantling and taking out the existing Air conditioner Split type of any description, any make and in any position 1.5 TR/2 TR capacity, both indoor and outdoor unit single phase, strip opening , cleaning and servicing of the AC with using caustic soda/detergent solution, cleaning of suction air filter and coil of indoor unit and brazing the discharge and suction line, reassembling, fixing and testing of the AC complete all as specified and directed by Engr-in-Charge. | 100.00 | Each Job |
| 2 | Note: (Applicable for Sch A BOQ Item No.1.00). (i) Split type AC's shall be taken from department on "as and where installed" basis. (ii) Split type AC's are to be maintained for heating as well cooling , where this provision is in the machine. (iii) The spare parts measured & paid separately as supply only rates. Rate for fixing of spare parts (ie compressor, condensing coil, cooling coil & blower motor) under relevant items shall be included in item No.1). (iv) The contractor shall ensure and assess at the site any initial maintenance required, to make the all Split type AC's in proper working condition, at the time of taking over and he shall be laible to make all listed handed over units functional. (ii) Charging of gas, if required, shall be measured and paid for separately under appropriate item of Schedule `A'. However, vacuum and pressure leakage testing with nitrogen (N2), if any required, is deemed to be included under the unit rate quoted by the contractor for this item. | ||
| 3 | Repair to existing compressor unit of suitable capacity/ model in the unit properly for 1.5/2.0 TR window/Split type AC complete, all as specified and directed by Engineer-in-Charge. | 1.00 | Each |
| 4 | Supply only new Rotory type compressor sealed unit of suitable capacity/ model in the unit properly for 1.5/2.0 TR window/Split type AC complete, all as specified and directed by Engineer-in-Charge. | 2.00 | Each |
| 5 | Supply only new condensing coil unit for Split type AC of any type/ any capacity complete, all as specified and directed by Engr-in-charge. | 1.00 | Each |
6 Days Left