| 1 | Supply, installation, testing and commissioning of Pressure Transmitter with proper wiring including necessary power pack for supply of DC complete all as specified and directed:-
Power supply : 24 V DC
Enclosure : IP 65
Temperature : 0 to 80 Celsius
Accuracy : Maximum 1 %
Pressure Range : 0 - 40 bar
Output Signal : 4-20 mA
Response Time : 4 ms
Make : I&S/Endress+Hauser/Yokogawa/Rosemount | 9.00 | Each |
| 2 | Supply, Installation,Testing and Commissioning of Smart Hydrostatic Level Transmitter at Sump and overhead tank for measurement of level with following specification complete all as specified and directed:-
Range : 0-10 meters
Accuracy : 0.2 % minimum
Supply Voltage : 24 V DC
Output : 4-20 mA
Operating Temprature : 0 to 50 C
Response Time : Minimum 150 ms
NOTE :-
1). The Level Sensor Indicator need to be covered in a polycarbonate box of suitable size before installation on OHT or Sump.
2). The Programming of Level Sensor, e.g. Changes in range of sensor, changes in operational features etc. shall be carried out by authorized system integrator of the provided makes. The programmer shall submit a letter from the OEM as proof of his being an authorized system integrator of the OEM. The programmer shall also submit a signed report on original letterhead of the OEM that testing & commissioning has been carried out by him.
Make: I&S / Endress+Hauser / Siemens. | 10.00 | Each |
| 3 | Supply, Installation, Testing & Commissioning of Indoor type PLC (Programmable Logic Controller) based Pump and Valve Automation, Protection Panel comprising with Wirelesss GSM based Communication suitable for control and monitoring of 01 No Submersible Pump, 02 Nos Motorized Butterfly Valve, 02 Nos Electrical Actuator for Sluice Gate Valve, 01 No Pressure Transmitter, 01 Nos Hydrostatic Level Transmitter, 01 Nos Flow Meter complete all as specified and directed. The panel should be of minimum size 1100(H) X 1000(W) X 300(D) mm fabricated with 2 mm thick CRCA Sheet. (Location :- Pump House No. 1,2,8,10, Polo, Panditwari, Ranghanwala, OTCT, MT)
(i) The Panel should also comprising the following items:-
(a) Water Level Sensing & Display
(b) Automatic Pump On/Off
(c) Automatic Operation of Motor Actuated Sluice & Butterfly Valves
(d) Single Phasing Prevention
(e) Auto Mode Operation (all connected sub systems including all valves in pump houses and pumps) from the PLC based Control Panel.
(ii) 01 No PLC with follwing specifications:- (MAKE : HORNER/L&T/GE AUTOMATION/PHOENIX CONTACT)
(a). 1 Nos RS 485 communication port and 1 No Ethernet communication port.
(b). Suitable Nos of digital / analog input and outputs.
(c). Programming Software based on IEC to facilitate building of custom build function blocks.
(d). Industrial Grade Processor, Web Server and SMTP E-mail service.
(e). Protocol : Master/Slave Modbus; Expandable upto 248 I/O s and 7 expansion module.(iii) 01 No HMI - 4" Graphical Touch screen display with follwing specifications:- (MAKE: HORNER/ L&T/ GE AUTOMATION/ SCHNEIDER)
| 9.00 | Each |
| 4 | (a). 01 No RS 485 communication port and 01 No. USB port
(b). Serial multilink and USB downloading port
(c). Support external data storage on a USB memory stick for storing production data and backing up applications.
(iv) 01 No SMPS of 5A rating suitable according to panel design. (MAKE : MEAN WELL / SCHNEIDER / TTPL/ PHOENIX CONTACT / OMRON)
(v) Suitable Nos of interposing relays of 220VAC & 24 VDC coil rating and 6 A contact rating.
(vi) Suitable Nos of relay cards with operating voltage 24VDC, with continuous current of 5A. Card must be of 8 channel & having 8 relays.
(vii) MCB rating 16A, 10A, 6A as suitable according to panel design. (viii) Illuminiated push button, Indicator lamp, Selector switches as suitable according to panel design.
(ix) Audio visual alarm indicator as suitable according to panel design.
CRCA Enclosure
Make of the PLC based panel (MAKE : I&S / Adlec / Tricolite / Rockwell Automation )
NOTE : (i) The Programming, Testing, Commissioning & Integration of PLC Panel shall be carried out by authorized system integrator of the provided makes. The programmer shall submit a letter from the OEM as proof of his being an authorized system integrator of the OEM. The programmer shall also submit a signed report on original letterhead of the OEM that Programming, Testing, Commissioning & Integration has been carried out by him.
(ii) The quotatd rate shall be included the rate for testing commissioning and integration of PLC.
| | |
| 5 | Supply, installation, testing and commissioning and Programming of Master Control Station (SCADA Software).
The scope includes:-
Services for programming, configuration and customisation of the Smart Station Platform with respect to the Water supply Module as per actual site conditions and requirement of the engineer.
(a). Landing Page to depict criritcal paramters viz. - Level of water in all tanks, pump status ON/OFF/FAIL
(b). Creation of drop down tabs to monitor the all Pump houses and Remote PLC Panel systems individually
(c). Creation of individual PLC Panel wise schematics and layouts for the Water Supply system as per the actual site including display of all relevant parameters viz. Water level, Pump ON/OFF/FAIL status, Valve OPEN/CLOSE/FAIL status
(d). Soft keys for remote manual operation of all pumps and motorised valves from the Master Control station.
(e). Creation of Day wise Reports for :-
(i) Run hours of pumps
(ii) Pump / valve operation failures
(iii) Active/Return status of each equipment with date and time.
(iv). Configuring notifications, alerts and alarms as per preset logic.
(v) Consumption Patterns - Daily, Weekly, Monthly and Annually.
Make of SCADA: - Schneider Electric, GE Automation, Siemens, Rockwell Automation, L&T / Phoenix Contact.
(f). Personal Computer as central Server for development version of the scada software and reporting the software with following specifiaction:- Intel 8th Gen Core I5, 16 GB RAM, 1 TB HDD, Keyboard / Mouse. Make:- Dell, HP, Lenovo & 32 inches LED monitor/ LED TV Make:- Sony, Samsung, LG.
(g). 2KVA UPS including batteries for 1/2 Hr backup
NOTE:- Contractor shall provided 02 Nos trained operator in each server room (02 Nos) during defect liability period of 02 years without any extra cost.
| 2.00 | Each |