Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4659920 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Building No P-185, P-212 And P-286 At Anarwala Under Ge Dehradun |
| Last Date For Submission | 22nd Jul, 2026 |
| Opening Date | 24 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 209940.00 |
| Estimated Cost | 13494000.00 |
| City | DEHRADUN |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for brick work with sub class 'B' brick straight or curved on plan exc. 6 m mean radius built in cement mortar 1:6 including all quoins, arches, pillars including demolition of old existing brick/stone work etc complete all as specified and directed. | 25.00 | Cum |
| 2 | M&L for brick work with sub class 'B' brick straight or curved on plan exc. 6 m mean radius built in cement mortar 1:6 including all quoins, arches, pillars including demolition of old existing brick/Stone work etc, but except bricks complete all as specified and directed. (Old bricks obtained from demolition shall be reused) | 25.00 | Cum |
| 3 | M&L for brick work with sub class 'B' brick straight or curved on plan to any radius built in cement mortar 1:4 as in half brick thick wall including demolition of existing brick work or stone masonary built in cement mortar including all quoins, arches, pillars etc. complete all as specified and directed. | 30.00 | Sqm |
| 4 | M & L for 15 mm thick rendering on brick/stone work or concrete surface in cement mortar 1:4 on brick work or concrete surface, surface finished even and fair with water proofing compound as per manufacture instruction complete all as specified & directed. Note: Water proofing compound will be measured & paid separately under respective item of the schedule. | 200.00 | Sqm |
| 5 | M & L for 15 mm thick rendering on brick/stone work or concrete surface in cement mortar 1:6, surface finished even and fair complete all as specified and directed. | 100.00 | Sqm |
6 Days Left