| Tender ID | 4447956 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | L028- Badi Panyali To Nani Panyali Mr Stage-i And Ii |
| Last Date For Submission | 12th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 1049000.00 |
| Estimated Cost | 0.00 |
| City | DEHRADUN |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Hill side Cutting | ||
| 2 | Earth work in Hill Road (Hill Side Cutting):- Excavation in Hilly area for construction of road in all types of soils, rocks and E&B etc. as met at site true to lines as per plan, L section Cross Slope, super elevation as required also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes with all lifts & leads required for safe disposal of surplus excavated material at suitable dumping places indicated in Drawing by mechanical means/ manual means and including construction of required coolie walling for retaining and muck, without otherwise damaging Forest, Forest Land, Utilities, Private and Public Properties, including slip clearance till the completion of the work as directed by Engineer-in-charge as per Technical Specification Clause 1601, 1602 & 1603 of MORD Specification for Rural Roads 2014. | 1.000 | Job |
| 3 | PROTECTION WORK | ||
| 4 | Excavation for Structures:- Earth work in Excavation foundation for cross drainage structures, retaining walls, breast walls & other similar structures in all types of soils and rocks as met at site with all leads, lifts and disposal of surplus earth as directed by engineer in charge including supply of all material labour, T&P etc. required for proper completion of work in accordance with the MoRD as per Technical Specification Clause 305.1&300 | 1505.840 | Cum. |
| 5 | Random Rubble Stone Masonry laid in 1:5 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.as MORD specifications) | 738.600 | Cum. |