Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4835512 |
|---|---|
| Organisation Name | Airports Authority Of India |
| Tender Brief | Provision Of Clean Agent Based Fire Suppression System For Critical Nav-aids Sites Like Localizer, Glide Path And Dvor At Dehradun Airport |
| Last Date For Submission | 25th Jul, 2026 |
| Opening Date | 27 Jul, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 77340.00 |
| Estimated Cost | 2578000.00 |
| City | DEHRADUN |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Design, Supply, Installation, Testing & Commissioing of Gas Suppression System including clean agent gas (FK-5-1-12) of 4.5% concentration, flooding system comprising of the following items as per NFPA 2001 & Upto date amendments standards consisting of Cylinder PESO Approved, complete with UL / VDS / PESO Approved valve assembly and arrangement for supervisory switch connection for monitoring cylinder pressure,a pressure gauge with a safety burst disc, electronic control head / Solenoid, pressure operated control, head, flexible hose, strap, NRV, Pressure Switch and a safety cap, required nos of Nozzles (UL / VDS listed), Piping, Manifold etc. complete as required. Gas. Design includes the Cylinder capacity, volume of Gas, Nos. of Nozzles, piping design and pressure calculations using certified (PESO/BIS/UL/VDS) design software suitable for seamless steel cylinder for the rooms with dimensions at per enclosed drawings duly vetted by manufacturer (OEM) shall be submitted prior to starting of the works. LEGEND : CV:Ceiling Void; RV: Room Void; | ||
| 2 | Design for DVOR : Equipment room(RV-75.26 m3 & CV-3.47 m3) | 1 | Job |
| 3 | Design for DVOR : UPS & Electrical room(RV-20+20 m3 ) | 1 | Job |
| 4 | Design Glide path & Localizer : Equipment room(RV-65 m3) and UPS cum Electrical room(RV-60 m3) | 1 | Job |
| 5 | SITC of UL & PESO approved Seamless storage 80L cylinder of FK-5-1-12 agent complete with valve assembly, pressure switch with safety burst disk & safety cap and other standard accessories including suitable size mounting Straps (2 nos. of straps for each cylinder). | 3 | Each |
21 Days Left