Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4852229 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | Ut134782 L029 Bonga To Kyan Idalgaon Mr Stage I And Ii |
| Last Date For Submission | 18th Jul, 2026 |
| Opening Date | 18 Jul, 2026 |
| Document Cost | 5310.00 |
|---|---|
| EMD | 678000.00 |
| Estimated Cost | 33898000.00 |
| City | DEHRADUN |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | HILL SIDE CUTTING | ||
| 2 | Earth work in hill road (hill side cutting/filling):- Excavation in hilly area for construction of road in all types of soils & rocks with E&B etc as met at site true to lines as per plan, X section, L section camber, super elevation as required also including uprooting & cutting of bushes dressing of road surface to the required level and slopes with all lead, lifts and safe disposal of surplus excavated material at suitable dumping places by mechanical means/ manual means indicated in the drawing with out damaging forest and forest land including slip clearance till the completion of work. | 1.000 | Job |
| 3 | Removal of land slides (Slip clearance) in all type of soil and rock by mechanical means/ manual means and disposal of safe side only in after completion of hill side cutting as per road design as directed by Engineer-in-charge and MORD specifications , Clause 1611 . (Slip clearence considered only those reaches where the Hill side cutting has been completed and handed over to Engineer -In- Charge ) | 2622.150 | Cum |
| 4 | Disposal of exvacated material obtained from hill side cutting including loading and disposal up to 1000 M lead as directed by Engineer-in-charge and as per MORD specifications Clause 302.3.11 | 8000.000 | Cum |
| 5 | Excavation for Structures:- Excavation in foundation for cross drainage structures, Retaining walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer - in - Charge also including supply of all materials, labour, T&P etc required for proper completion of work. | 530.010 | Cum |
11 Days Left