Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4448146 |
|---|---|
| Organisation Name | Irrigation And Flood Control Department |
| Tender Brief | Construction Of Rcc Berm On Both Side Of Bund Drain From Rd 90m To Rd 1140m To Make Drain Approachable For Cleaning And Desilting For The Year 2025-26. |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 05 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 1622133.00 |
| Estimated Cost | 81106627.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction, maintenance of cross bundies of earth filled E.C. Bags to enclosed pockets each of about 50 meters length in the drain and to continuously pumping out the standing drain water/rain water/ water coming from nearby houses/ sludge/sewage entering into the drain from all possible sources including surface as well as sub surface to keep the pockets dry for satisfactory execution of work along the drain length and removal of cross bundies. (The payment of bundies shall be made 50% during the execution and balance 50% shall be released after excavation of work and removal of bundies.) | 96 | Per Metre |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 12 | Cum. |
| 3 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered). Depth exceeding 1.5 m but not exceeding 3 m. | 10500 | Sqm. |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 242 | Cum. |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 5670 | Cum. |
5 Days Left