Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4115603 |
|---|---|
| Organisation Name | Delhi Development Authority |
| Tender Brief | Corrigendum : Annual Maintenance Of Palam Drain Road And Sitapuri Drain Road, Dwarka For Resolving Grievances/complaints Through Various Online/offline Portals And To Keep Maintain The Road As Per The Caqm Guidelines |
| Last Date For Submission | 7th May, 2026 |
| Opening Date | 09 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 35404.00 |
| Estimated Cost | 1770189.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., isposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 100 | sqm |
| 2 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost). | 50 | sqm |
| 3 | Providing and laying 60 mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. | 50.00 | sqm |
| 4 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 100.00 | mtr |
| 5 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer -in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost). | 50.00 | mtr |
4 Days Left