Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4366537 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Comprehensive Maint Of Vikram Batra Vihar, Fodder Line, Capt Line, Mohan Enclave, Cmp Line In The Area Of Age B/r-ii Under Ge (west) Delhi Cantt-10 |
| Last Date For Submission | 18th Jun, 2026 |
| Opening Date | 20 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 70000.00 |
| Estimated Cost | 3500000.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cutting and taking out plants, tree roots from Md Accn bldgs in any position and height and treated with necessary chemical/acid to avoid for this growth and making good the disturbed portion with PCC 1:2:4 type BO including finishing etc complete all as specified and directed. (Note: The cost of scaffolding required for repairs is deemed to be in the quoted rate by the Contractor). | 150.00 | Each |
| 2 | M&L jointed, grouted and flush pointing of roof brick tiles cement mortar 1:3 and including raking out old jointed, grouted / flush pointing, cleaning of brick or brick tiles, laid flat, in roofs, etc complete all as specified and directed. | 1102.00 | Sqm |
| 3 | Demolition of cement concrete (unreinforced) / sunken floor in ground floor and paving not exc. 15cm thickness (below or above ground level), removal of rubbish beyond MOD land complete all as specified and directed. | 20.00 | Cum |
| 4 | M&L for sunken treatment as following over it complete all as specified and as directed:- (a) Rendering 10 mm thiick in CM 1:4, (b) Two coats of tapecrete mixed (1:2) with cement slurry @ 3Kg/sqm per sqm or as per manufactures's instruction, surface finished even and smooth (c) Applying a coat of bitumen primer @ 0.70 kg /sqm, applying one coat of hot bitumen 85/25 gde @ 2.6 kg/sqm (d) Applying one layer of 0.5 mm thick fibre tissue/APP membrane | 55.00 | Sqm |
| 5 | M&L for PCC 1:5:10 type E-2 (40 mm graded stone agg) as in sunken floors complete all as specified and directed. | 6.91 | Cum |
6 Days Left