Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Delhi Development Authority
Tender ID4382663
Organisation NameDelhi Development Authority
Tender BriefCorrigendum : Construction Of Internal Cc Road With Storm Water Drainage, Kerb Stones, Change Room Cubicles And Miscellaneous Civil Works At Sports Complex, Dwarka Sector-23.
Last Date For Submission3rd Jun, 2026
Opening Date04 Jun, 2026
Cost
Document Cost0.00
EMD114007.00
Estimated Cost5700356.00
Location
CityDelhi
StateDelhi

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m, as directed by Engineer-in-Charge. All kinds of soil 522.00Cum
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.60.00Cum
3Excavating trenches of required width for pipes, cables, etc. including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia 90.00m
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.8.00Cum
5Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-Charge.572.00Cum
3rd Jun, 2026

3 Days Left

WhatsApp