Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4361044 |
|---|---|
| Organisation Name | Irrigation And Flood Control Department |
| Tender Brief | Corrigendum : Construction Of Two Lane Bridge Near Dichaon Village Intersection For Easy Commuting Of Villagers For Crossing Mungeshpur Drain For The Year 2026-27 |
| Last Date For Submission | 11th Jun, 2026 |
| Opening Date | 11 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 1387360.00 |
| Estimated Cost | 69368023.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of coffer dam made of earth and protected with earth filled gunny bags/ HDPE bags placed on either side slope of coffer dam of suitable dimension as per requirement at site of work to withstand the pressure of standing/flowing water of the drain in order to keep the working area free from incoming water/water coming through any broken water mains and subsequent removal upon completion of work upto DBL of the drain to the satisfaction of the Engineer-in-charge. | 75.00 | Mtr |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil | 3140.00 | cum |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 110.00 | cum |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1625.00 | cum |
| 5 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil. | 1844.00 | cum |
6 Days Left