Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID5009740
Organisation NamePublic Works Department
Tender BriefCorrigendum : Consultancy Services For Conducting 2 Nos Feasibility Studies (i) Elevated Road Over Karawal Nagar Drain From Ankur Enclave To Gokalpur Metro Station And (ii) Construction of Elevated Road On Guru Harkishan Road No. 43 (britania Chowk To Outer Ring Road Via Sha
Last Date For Submission14th Aug, 2026
Opening Date14 Aug, 2026
Cost
Document Cost0.00
EMD643287.00
Estimated Cost32164360.00
Location
CityDelhi
StateDelhi

Register to see full details

BOQ Items
#ItemQtyUnits
1Lump sum fees for providing consultancy for Geometric design, traffic management, environment impact study and formulation of proposal for Integrated Transit Corridor Development and Street Network/ Connectivity Plan for the corridor/ influence zone along with detailed design of all intersections and mid-sections based on traffic and feasibility studies for the corridor / network. SH:- Consultancy services for conducting 2 Nos feasibility studies (i) Road over Karawal Nagar Drain from Ankur Enclave to Gokalpur Metro Station & (ii) C/o Elevated road on Guru Harkishan road No. 43 (Britania Chowk to Outer ring road via Shakur Basti Railway Station). including submission to UTTIPEC, DDA, MCD, DUAC, Railways etc., providing necessary support / input till final approval of scheme from UTTIPEC, DDA, MCD, DUAC, Railway, IGL etc. complete all as per scope of work for (a). Pre-feasibility :- i. Reconnaissance survey as per IRC SP 19-2001 and Traffic survey. ii. Preliminary Topographical survey. iii. Broad Structural features including lane configuration. iv. Lane configuration and intersections/ Junction / service roads. v. Utility shifting requirement along with tentative estimates. vi. Forest /Environmental /CRZ clearance requirement. vii. Tentative/ Normative cost estimate with reasonable accuracy. viii. Land acquisition tentative cost assessment. ix. Submission of PPR for acceptance of E-in-Charge as per Chapter 3, Annexure 14A of SOP to CPWD works manual and other provisions of PWD CPWD works Manual and Directions of UTTIPEC and Delhi government as modified from time to time (to be suitably modified for infrastructure work) x. Feasibility of 3 proposals based on these surveys.
2(b). Detail Feasibility:- i. Submission of inception report for scrutiny and approval of PWD, Govt. of Delhi. ii. Alignment option in consideration of tree detailed and other features. Detailed traffic survey as per IRC codes Detailed Topographical study iii. Approval of conceptual plans various options of proposal from UTTIPEC Core Group. iv. Approval of various options/plan by UTTIPEC working groups along with cost benefit analysis of scheme. v. Approval of final plan by UTTIPEC Governing body. vi. Preparation of 3D Walkthrough as per guideline of DUAC. vii. Approval of plans and architectural 3D views by DUAC, NOC from ASI and Fire Service Department and other relevant approval from concern bodies. viii. Submission of final Drawings (Detailed drawings based on Street Design Guidelines of UTTIPEC and complete in all respect as per TOR) and DPR of the project to the Department. ix. Payment to GSDL or any other Government approved GIS provider of underground utilities as per actual demand. x. Submission of detailed estimate from concerned department regarding shifting of utilities i.e. DJB, BSES, DTL, Tata Power, IGL, MTNL, Telecom Services or any other concerned department. xi. Submission of Details of trees in dwg. Format, Kml file or any other format required as per forest department along with processing the case and requisite approval from forest department. (The cost of tree cutting/ transplantation and corresponding requisite land will be paid directly to beneficiary/ forest department) xii. Submission of Land acquisition details from Govt., Private, Agriculture, Commercial, forest and any other, along with processing the case and requisite land acquisition from concern. (The cost of land acquisition will be paid directly to beneficiary) xiii. Submission, processing and obtaining mandatory approval / NOC from concern bodies. xiv. The Consultant shall carryout Geo-technical investigation and the bore holes will be taken at a distance of 1 km for the elevated section and 2 bore holes will be done at the location of proposed underpass. The depth of the bore holes will be minimum 35 m. xv. Preparation of storm water drain plan co-Align existing network of storm water and other services. xvi. Preparation of conceptual structural drawings with technical specification for NIT. xvii. Preparation of detailed methodology of construction with technology required. xviii. Details of projects for pre-construction activities as per for acceptance of E-in-Charge as per Chapter 3 and Annexure-C of SOP to CPWD works manual, other provisions of CPWD works Manual and Directions of UTTIPEC and Delhi government as modified from time to time (to be suitably modified for infrastructure work) & any other details relevant to project. xix. Finalization of EPC tender document for the department and as per direction of the Engineer-in-Charge.
3Consultancy services for feasibility study of elevated road over Karawal Nagar Drain from Ankur Enclave to Gokalpur Metro Station.1.0Job
4C/o Elevated road on Guru Harkishan road No. 43 (Britania Chowk to Outer ring road via Shakur Basti Railway Station).1.0Job
14th Aug, 2026

13 Days Left

WhatsApp