Tendering Authority: Irrigation And Flood Control Department
Tender ID3344667
Organisation NameIrrigation And Flood Control Department
Tender BriefCorrigendum : Development Of Streets And Side Drains Of Part I To Viii In Prahladpur Banger Extn. Colony (regd. No. 89 Eld, Part I To Viii) In Bawana A. C. (street No. 1 To 5).
Last Date For Submission30th Apr, 2026
Opening Date30 Apr, 2026
Cost
Document Cost0.00
EMD948620.00
Estimated Cost47430981.00
Location
CityDelhi
StateDelhi

Register to see full details

BOQ Items
#ItemQtyUnits
1Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar.484.00Cubic Metre
2Supply of building Rubbish/Malba/similar unserviceable material dismantled or waste material by mechanical transport including loading, un-loading, stacking and banking the same in layers not exceeding 20cm in depth, braking clods watering rolling each layer with 1/2 tonne roller or wooden or steel rammers and up to embankments for roads, flood banks, marginal banks and guide banks or filling up ground depression, with all leads & all lifts.2277.00Cubic Metre
3Supply of earth including excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers and rolling every 3rd and top most layer with power roller of minimum 8 tonne and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions by mechanical transport within 10 km lead and lift upto 1.5m including royalty.2403.00Cubic Metre
4Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.264.00Cubic Metre
5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).264.00Cubic Metre