Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4898875 |
|---|---|
| Organisation Name | Delhi Development Authority |
| Tender Brief | Corrigendum : Improvement Of 28.00m And 20.00m R/w Roads Of Sector-24, Rohini For The Year 2026-27. |
| Last Date For Submission | 24th Jul, 2026 |
| Opening Date | 25 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 1428014.00 |
| Estimated Cost | 71400684.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cold Milling of Asphaltic Surface/pavement (removal of BC/DBM or any asphaltic layer from road surface/concrete surface) to a depth ranging from 25 mm to 100 mm, maintaining the underlying surface in proper shape, line, level and slope, and leaving it undamaged and suitable for laying a fresh asphaltic layer in line, level, size depth as directed by Engineer-in-charge including transportation and disposal of milled material from site for all lift and leads, cleaning of surface and rectification of any damage/distress caused during milling operations, etc. complete. The work shall be executed using approved machinery and methods conforming to IRC specifications, including disposal of reclaimed asphalt pavement (RAP) material by the agency. | 578.000 | Cum |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 3.000 | Cum |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge: All kinds of soil | 1256.000 | Sqm |
| 4 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom.With medium setting bitumen emulsion: On W.B.M / W.M.M. @ 0.4 kg/sqm | 1256.000 | Sqm |
| 5 | On bituminous surface @ 0.25kg/sqm | 91029.000 | Sqm |
9 Days Left