| Tender ID | 4973052 |
|---|---|
| Organisation Name | Delhi Development Authority |
| Tender Brief | Corrigendum : Installation Of Barbed Wire Fencing Around Green Cover Area And Other Civil Work Under Aranya Policy In Various Parks Under Jurisdiction Of Sd-iv/hcd-5. |
| Last Date For Submission | 30th Jul, 2026 |
| Opening Date | 31 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 113736.00 |
| Estimated Cost | 5686820.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. (a) All kinds of soil | 1812.000 | each |
| 2 | 1:2:4 (1 cement : 2 coarse sand (zone-lll) including manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 25% : 4 graded stone aggregate 20 mm nominal size including Recycled Concrete Aggregate (RCA) upto 25%) | 231.000 | cum |
| 3 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 51863.000 | meter |
| 4 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. | 11889.000 | Kg |
| 5 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1243.000 | kg |