| Tender ID | 4370701 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Maintenance To Various Roads Under Pwd Division East Roads During 2026-27. (sh- Desilting Of Drain At Disused Canal Road Under Sub-division East Road-i). |
| Last Date For Submission | 29th May, 2026 |
| Opening Date | 29 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 109852.00 |
| Estimated Cost | 5492615.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Initial Desilting of PWD's open / covered / pipe / RCC box / brick drains and culverts etc. by deploying labour / supersucker / pumps / jetting machines / any other suitable mechanical means including taking out silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish and its final disposal to authorised MCD/any other dumping ground as approved by Engineer-in-Charge within 4 months. The rates includes all above operations including taking out silt / floating material / malba / waste materials etc. from the drains / culverts, keeping it adjacent to drains for its drying (if required/ allowed by Engineer-in-Charge), its disposal to any temporary dumping ground (if required/ allowed by Engineer-in-Charge) and its final disposal to MCD/any other dumping ground, as approved by Engineer-in-Charge, all inclusive. (The cost of disposal of silt / floating material / malba / waste materials etc. from drain side/temporary dumping ground (if required/ allowed by Engineer-in-Charge) will be paid seperately under agreement item No.2. | ||
| 2 | Drains above 3000mm or more in width and all depths / drains upto 3000 mm or more. | 2900.00 | Mtr. |
| 3 | Disposal of silt, sludge, building rubbish, earth mixed malba, plastic bags, all type of floating, solid and semi- solid malba/ rubbish / similar unserviceable dimantled or waste materials by mechanical means/including loading, transporting and unloading the same at any authorized Municipal/ any other Dumping Ground including weighing at plant etc. complete as per direction of Engineer-in-charge. Weighing and unloading at the plant shall be as per procedures/ rules of the Dumping Ground Management. The rates are inclusive of all operations, labours, leads and lifts from site of work to the authorized Municipal/ any other Dumping Ground. (Processing fees at prescribed rate of dumping ground will be deposited by the agency and shall be reimbursed by the department on production of only original cash receipts). (Payments for disposal under this item will be made on production of original Municipal dumping ground receipts), the agency shall also submit pre & post photograph in soft/hard copy. | 6090.00 | Mtr. |