Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4845802 |
|---|---|
| Organisation Name | Delhi Development Authority |
| Tender Brief | Corrigendum : Providing And Fixing Of (i)fencing At Metro-line Side Portion Of Sanjay Lake Dda Park (ii)installation Of Signboards At Sanjay Lake Dda Park And District Park Near Apollo Hospital, Jasola, W.r.t. Plantation Activities Under Aranya Policy Under The Ju |
| Last Date For Submission | 14th Jul, 2026 |
| Opening Date | 15 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 23396.00 |
| Estimated Cost | 1169772.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavating holes more than 0.10 cum & up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto1.5 m : All kinds of soil. | 317.00 | each |
| 2 | R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | 13.00 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 39.00 | cum |
| 4 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used: (a)With G.I. barbed wire | 6661.00 | m |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 39.00 | cum |
4 Days Left